The project consisted of the modification of an existing
half diamond interchange to a full diamond interchange. The design was
completed for Osceola County and approved through FDOT District 5 and FHWA.
Elements required included roadway design, traffic control plan design, signing
and pavement markings, geotechnical investigation, right-of-way mapping,
permitting, and construction engineering inspection.
The Project was completed on
schedule and under budget.
|