S.R. 50 Widening

Home
Up

 

SR 50 Widening


This project involves the design for the widening of an existing rural 4-lane divided roadway to six lanes urban with curb and gutter.  The project includes the design of a closed drainage system with stormwater management facilities, extension of a double 11’ x 8’ box culvert and obtaining the environmental permits required for the project.  CES is also providing the signing and pavement markings and the flashing signalization at Tubb Street.  Right-of-way survey and mapping is required for the project including acquisition for the stormwater facilities.  The project also includes structural design for a double 11’ x 8’ RCBC extension and signal strain poles and geotechnical services for the roadway and drainage system.

   

 

 

 

 

 

 

 

   

 

 

 

       

Send mail to slowe@cescivil.com with questions or comments about this web site.
Last modified: 03/27/08