|
|
|
SR 50 WideningThis project involves the design for the widening of an existing rural 4-lane divided roadway to six lanes urban with curb and gutter. The project includes the design of a closed drainage system with stormwater management facilities, extension of a double 11’ x 8’ box culvert and obtaining the environmental permits required for the project. CES is also providing the signing and pavement markings and the flashing signalization at Tubb Street. Right-of-way survey and mapping is required for the project including acquisition for the stormwater facilities. The project also includes structural design for a double 11’ x 8’ RCBC extension and signal strain poles and geotechnical services for the roadway and drainage system.
|
|
Send mail to
slowe@cescivil.com
with questions or comments about this web site.
|