|


| |
US 27
This
2.5-mile section of US 27 is being widened from an existing 4-lane rural section
to a 6-lane suburban section without reconstructing the existing roadway. The
project required a pond siting report, ditch calculations and stormwater
management facility design. This roadway is part of the FIHS system and the
design is being coordinated with projects to the north and the south.
|