Comprehensive Engineering Services, Inc.
Comprehensive Engineering Services, Inc.
  • Home
  • About
  • Services
  • Current Projects
  • Experience
  • Careers
  • Contact
  • Home
  • About
  • Services
  • Current Projects
  • Experience
  • Careers
  • Contact

WHAT ARE WE WORKING ON?

Picture
FDOT District One
  • SR 739 (Metro Parkway) from Daniels Parkway to Winkler Avenue in Lee County - Widening
  • US 98 from Edgewood Drive to Main St. in Polk County - Widening
  • US 27 from Presidents Drive to SR 60 in Polk County - Widening
  • SR 45 from Hickory Dr. to Emerson Square Blvd. - Resurfacing
  • District Wide Minor Design
  • District Wide Resurfacing Design
  • Continuing Resurfacing Design

Picture
FDOT District Two
  • Dennis Howell Road over Warrior Creek Bridge No. 384029 - Roadway for Bridge Replacement
  • SR 134 from East of Wesconnett Boulevard to just west of US 17 - Resurfacing
  • SR 111 (Cassat Avenue) from Blanding Blvd. to I-10 EB Ramp in Duval County - Traffic Signals
  • District Wide Landscape Design - Maintenance of Traffic Design
  • Continuing Landscape Design - Maintenance of Traffic Design

Picture
 FDOT District Three
  • SR 30 (US 98) from Ortega St. to Okaloosa County Line in Santa Rose County - Lighting Design
  • Design Group 17-01 - Intersection Improvements
  • Design Group 20-04 - Resurfacing
  • Design Group 20-09 - Roadway Design for Bridge Replacement
  • Design Group 20-18 - Lighting Design
  • Design Group 22-06 - Resurfacing
  • District Wide Miscellaneous Traffic Operations
  • Continuing Traffic Operations Safety Design

Picture
FDOT District Five
  • SR 507 (Babcock Road) from north of Malabar Road to south of Palm Bay Road in Brevard County - Widening
  • SR 50 from East of Avalon Park Boulevard to Chuluota Road in Orange County - Widening
  • SR 5 at Park Avenue - Traffic Signals
  • SR 5054 at CR 509 - Traffic Signals
  • SR 5 Resurfacing and Bridge Replacement Bundle - Roadway & Traffic Design
  • SunRail Vehicle Storage Facility Noise Wall - Lighting & ITS Design
  • Continuing Services for Roadway Design

Picture
FDOT District Seven
  • SR 580 from Shore Boulevard to Tampa Road - Resurfacing
  • Non-TBNext Design Services - Roadway & Traffic Design
  • I-75 at Big Bend Road Design Build - ITS & Lighting Design
  • Continuing Miscellaneous Design Support

Florida's Turnpike Enterprise
  • Turnpike Mainline from South Kissimmee Park Road to US 192 in Osceola County - Lighting & Traffic Design for Widening
  • District Wide Architectural and Tolling Design Services - Traffic Design
  • District Wide Miscellaneous Design

County Clients
Osceola County
  • Continuing Engineering Services
Volusia County
  • West Park Avenue - Traffic Design for Widening
  • Professional Site/Civil and Transportation Engineering Services - Traffic Design & Analysis

Picture
City Clients
City of Gainesville
  • City/CRA/GRU - Professional Architectural and Engineering Consulting Services
City of Winter Park
  • Continuing Services - Professional Transportation Planning and Engineering Services
City of Orlando
  • Continuing Services - Transportation Engineering and Planning Services
Orlando Utilities Commission
  • Continuing Lighting Design Services
Central Florida Expressway Authority
  • SR 408 from I-4 to SR 417 - Lighting Monitoring System
  • SR 528 from Narcoossee Road to SR 417 - Traffic Design & Analysis for Widening
  • SR 528 from Goldenrod Rd. to Narcoossee Rd. - ITS Design
  • Miscellaneous Design Consultant Services - Traffic Design and Studies
  • Miscellaneous Planning Services - Roadway & Traffic Design and Studies

Copyright © 2015 Comprehensive Engineering Services, Inc. All Rights Reserved.